GMP (Good Manufacturing Practices) quality remodeling is a major enhancement to your pharmaceutical safety management system, increasing your customer's confidence in your commitment to selling and producing safe, high-quality drugs.
Development of a BIM model for Analysis, Coordination, Planning, Development and Monitoring of a project developed in 2 phases:
For the first phase, the modeling and survey of the existing property was requested as a conceptual engineering project delivered in CAD format by BTS, generating as a final product the analysis and coordination of interferences found during the virtual pre-construction.
As a second objective, the monitoring and construction control from the BIM model was proposed, reaching the development of a LOD 400 in certain areas of the project due to the complexity of the installation and construction, as well as allowing to anticipate crashes and interferences, saving time in planning and corrective execution of conflicts for engineering.
Every successful BIM project is the result of hard work, and this applies to every discipline related to it. After researching and specifying the requirements to work, the sequence is planned to achieve effective development with which it will be possible to achieve the conceptualized goals, differentiate from others, among other things. Write about some of the challenges you faced when designing this product and what steps you and your team took to overcome them.
Development of a BIM model for Analysis, Coordination, Planning, Development and Monitoring of a project developed in 2 phases:
For the first phase, the modeling and survey of the existing property was requested as a conceptual engineering project delivered in CAD format by BTS, generating as a final product the analysis and coordination of interferences found during the virtual pre-construction.
As a second objective, the monitoring and construction control from the BIM model was proposed, reaching the development of a LOD 400 in certain areas of the project due to the complexity of the installation and construction, as well as allowing to anticipate crashes and interferences, saving time in planning and corrective execution of conflicts for engineering.
Every successful BIM project is the result of hard work, and this applies to every discipline related to it. After researching and specifying the requirements to work, the sequence is planned to achieve effective development with which it will be possible to achieve the conceptualized goals, differentiate from others, among other things. Write about some of the challenges you faced when designing this product and what steps you and your team took to overcome them.